Ethan's Ark Boat Pix 2006 |
View of the whole shebang. Note the green mast. | Looking forward from transom. The steering pedestal is in place. The hydraulic steering pump is installed and the engine controls and instruments are in place and operational.
|
Rudder installed. Prop and shaft installed. Prop aperture faired and painted with cooling holes.
|
Hydraulic steering reservoir and ram with the mounting bracket to spread the load on the transom. Some of the piping is shown.
|
Engine room Starboard side. Shows two 40 gal fuel tanks with associated plumbing. Fills not yet in place.
|
Engine room port side. Shows 80 gal fuel tank with 20 gal day tank (upper right corner). Framing on top of fuel tank for mounting a diesel generator. Scupper and bilge pump through hulls shown.
|
Port side of the main cabin showing the start of the galley. The Ice box is forward and athwartships. The stove goes aft and outboard. There is a counter/storage inboard running fore and aft.
|
Starboard side of main cabin showing start of settee/bunk. The storage here will be underneath the settee in drawers.
|
Aft cabin starboard side. Has bunk/settee/storage in place. Inside the bunk is insulated and the insulation is covered with a piece of white fiberglass sheet.
|
Another picture of the starboard side of main cabin showing start of settee/bunk. Note the tabbed in partial bulkheads that will make up the sides of the storage drawers.
|
These pictures were taken in Nov of 2006. The engine is in, the aft cabin bunks are installed. The control systems and the fuel system are installed.. Still need electrical and plumbing systems. I now feel comfortable that there is enough structure so that the boat can handle being in travel lift slings without being crushed.
|