This picture shows the mock up of the cabin beams with added side pieces used for support while strip planking the cabin sides. The strip planking is complete here. This picture shows the hull with the port side on its way to having the original fiberglass stripped off.
This photo shows the new hull shape with the cabin sides in place.

This shows the floors of the boat looking forward. Note the lead plates stacked on the starboard side..

This photo shows the forward starboard corner post.

This photo is of the aft port corner post
This photo is in September, with the deck beams in place. This photo shows the cockpit under construction.
The first six pictures on this page were taken in February 2001, and the last two pictures were taken in September of 2001. These pictures were taken after moving the boat to Dunedin in 2000. The top pictures show the hull partly stripped of the old fiberglass, and they show the cabin sides completed. There is detail of the forward corner posts of the forward cabin and the aft corner posts of the after cabin. The last two pictures show the  cabin top beams in place and the cockpit under construction..